Gang Sheet Grid
Fabrication / Practical workbench

A practical guide

Compare two regular-grid orientations for repeated rectangular transfers and estimate sheet utilization.

No account neededWorks in your browserEditable assumptions

Start with the actual project

Compare both orientations, then inspect the final artwork for crop marks, transparent margins and the printer’s required spacing.

Write down each measurement with its unit. Enter lengths in the displayed unit and keep counts separate from dimensions. If a product specification provides a value, use that value for the exact material or equipment involved.

MeasurementUnitExample
Printable sheet widthmm560
Printable sheet lengthmm1000
Transfer widthmm100
Transfer heightmm150
Gap between transfersmm5
Outer marginmm10

Work through the calculation

  1. Open the calculator and replace every example input that differs from your project.
  2. Read the named results and their units. A negative remaining-space result describes a fit problem, not a usable dimension.
  3. Save a baseline before changing assumptions. Adjust one measurement at a time to see what drives the result.
  4. Use the comparison table and the exact values beneath the chart to check the effect of a change.
  5. Export a worksheet or print the final result, then verify a sample before making an irreversible cut or purchase.

Project-specific checks

  1. This compares two uniform grids; it is not a mixed-size or globally optimal nesting algorithm.
  2. Use the printer’s printable area, and include required cutting space in the gap field.
  3. A rotated transfer must be acceptable for the artwork and printer workflow.
  4. Utilization excludes the white-ink underbase and is an area measure, not a cost or ink estimate.

Read rounding correctly

Whole-item counts may round upward to cover a requirement or downward to fit a space. The formula reference identifies ceil and floor operations. Displayed decimals are rounded for readability; calculations keep the underlying numeric precision.

When a number looks wrong

First check units and inside-versus-outside dimensions. Next check whether allowances were included twice. Finally compare the input assumptions with the project-specific checks above. The worked scenarios provide a reproducible starting point.

Open the calculator